The group plans to expand its second UAE ethane cracker with Linde Engineering. The project is intended to add 230,000 tonnes of annual capacity as part of the development of Ruwais’s chemicals hub.
Borouge also cites the future 1.4-million-tonne polyethylene capacity of Borouge 4. These figures describe targeted or developing capacity, rather than additional output already achieved.