The Mal wa Aamal programme's factory visit shows robotic welding and assembly equipment as part of preparations for a locally assembled electric vehicle.
The figures remain those of the officials interviewed and do not constitute a production audit. The report does not establish the exact share of Egyptian components or show that the target of 80 vehicles a day has been reached.