The partners want to adjust grid demand at peak times as cloud and AI workloads grow. The study will examine storage configuration, safety, metering and control systems.
Participation in demand-response and interruptible-load programmes will be assessed subject to market rules and approvals. The memorandum is non-binding; it is neither a construction decision nor evidence of electricity capacity already available.